ZC - 5.1-18650 into the shell machine
3.1.1 overview:
This product is suitable for the production of cylindrical battery lay down insulation pad - cell into the shell process. Multiple processes are automatically completed by one machine. The battery steel shell is poured into the hopper in batches; The insulation pad material is loaded in a whole roll. Manually put semi-finished cell into feeding inclined plate; Automatic feeding of equipment; Automatic alignment of the polar ear; Automatic pole ear shaping; Flush down the insulation pad; The cell enters the shell automatically; After entering the shell, the whole row of the cell flows out of the multi-station operation; The back can be connected with a three-in-one machine; A line from the shell to the rolling groove is completed. Adopt PLC control system; Touch screen man-machine interface; Human operation.
The equipment is well made, efficient, reliable, easy to operate and easy to maintain.
3.3.2 schematic diagram of working process:
3.3.3 technical parameters
1. After signing the purchase contract, party a shall provide party b with raw materials for debugging free of charge; Steel shell 200 PCS. 100pcs of electric cells. And ensure that the raw materials of the debugging sample are consistent with the raw materials used in the subsequent equipment.
2. The steel shell has no deformation and the dimensional tolerance meets the technological requirements.
3. The position of the coil core pole lug is normal, and the maximum deformation of the flat pole lug is ±5 °;
4. The maximum direct relative diameter of the steel shell is ≤ 0.2mm; Can enter the shell normally.
5. Basic parameters:
NO. | The parameter name | Technical parameters | unit | For note |
1 | Insulation pad loading method | The width of the 20 + / - 0.1 mm | MM | The whole volume loading |
2 | Steel shell feeding method | Random strain | a | 600 or so per time |
3 | Efficiency of the whole line | ≧ 50 | A/minute | |
4 | Yield of finished products | 99.80% | ||
5 | Device rotation rate | 95% | (not remembered for equipment or other reasons) | |
6 | Air supply | 0.5 ~ 0.8 | Mpa | |
7 | Voltage power supply | AC220V / 50 hz | ||
8 | Rated power | 0.5 | KW | |
9 | The machine volume | Length * width * height | MM | 1500 * 1200 * 1600 |
Cooperation commitment
1. New equipment promise
Our company guarantees that the goods provided to customers are brand new, complete and unused equipment.
2. Confidentiality commitment
Our company promises that without the written permission of any party, the other party's related drawings, technical information, business information and other business secrets and technical secrets must not be leaked to third parties in any way.
3. After-sales service commitment
(1) Two months from the date of shipment of the equipment, Party B is responsible for non-human faults in a timely and free warranty within one year (when the equipment is faulty, the after-sales service staff will respond within 2 hours after receiving the notification. According to the situation, personnel must be in place within 48 hours. No later than 60 hours, to ensure the continuity of production by the buyer;
(2) After the equipment has passed the warranty period, if there is a problem, the two parties communicate and deal with it. If necessary, after-sales personnel will be sent to repair it, and only the cost will be charged. Zh
(3) During the warranty period stipulated in the contract and technical agreement signed by the two parties, the company will provide a warranty for quality problems that are not caused by human damage during the normal use of our products.